LA COURNEUVE - TREATMENT CENTER (93)
land_treatment
On reservation
Important information
This site is accessible only by reservation validated by ECT. Before sending your trucks, you must register and obtain prior approval from the reservations department. This site is equipped with a weighbridge enabling invoicing by the tonne. The La Courneuve site will be closed on 16/08
Opening hours
Monday to Friday: 7H30-12h00 and 12h30-16h00 The La Courneuve site will be closed on 16/08
Your Contacts
Site manager
Jérôme Malherbe
N° de tél 06 02 42 84 08
DAP
The excavation site must be validated and registered by ECT with a PAD.
How do you use the land on this site?
Which ECT project?
Biological treatment center for polluted soil
ECT designed and built this biological treatment platform for polluted soil on a former denatured site belonging to the Conseil Département du 93. This is the only fully enclosed treatment site of its kind in the Paris region.