Explore our photo gallery dedicated to the manufacture and installation of the fertile substrate for the future Parc du Sempin in Chelles. These images illustrate every stage of this innovative process, from the preparation of green waste compost and inert soil from the construction industry to their mixing and application on site. Find out how our teams transform these recycled materials into fertile soil, ready to be planted in the park.
July 2024, production of fertile substrate at the Chelles site

Latest news

ECT strengthens its CSR commitment with a supplier charter
The sustainability of our business is based on a responsible approach and the collective commitment of all our employees and stakeholders. With this in mind, we have set up a
Read more
Experimental plots from the European Reecol project at the Mazingarbe site
At the foot of slag heap 49, the ECT site at Mazingarbe is a study area for the European REECOL research project , led in France by Ineris. This program
Read more
Landify US opens a site in Garnet, Palm Springs, California
https://www.groupe-ect.com/wp-content/uploads/2025/02/VIDEO-2025-01-10-07-53-21-USA-Remblaiement-Gardnet.mp4 Landify US continues to expand with the opening of a new site in Garnet, Palm Springs. This site, dedicated to the management of inert soil and materials from the
Read more