ECT Hauts-de-France opens a new site in Loison-sous-Lens (62)

ECT Icone ouverture de site

ECT uses soil from construction sites to create a space for relaxation and recreation

September 2023 | ECT Hauts-de-France opens a new site in Loison-sous-Lens.

On the site, the reuse of excavated soil from local construction sites contributes directly to the creation of a new leisure and recreation area.

Work is scheduled to take 4 months.

Access

The new ECT site is 2 km from exit 12 “Carvin, Harnes, Loison-sous-Lens” on the A21 freeway.

To reinforce site access safety, compulsory routes must be taken on entering and leaving the site.

Prior to evacuating their soil on the site, earthworkers must have validated a Declaration of Prior Authorization for their worksite with ECT, and make a reservation with the dedicated ECT department.

A development project at the entrance to the Parc des Berges de la Souchez
in partnership with the commune

The transformation of the site is being carried out in partnership with the commune of Loison-sous-Lens.

The project is part of an initiative to create a leisure and relaxation area in the Parc des Berges de la Souchez. The project completes the site’s facilities, in particular with the creation of a belvedere.

The project has several functions:

  • a place for nature in the city, with the creation of woodlands, copses, wetlands and an orchard,
  • a space for relaxation, meetings and entertainment, with the possibility of installing “guinguettes”.

Latest news

Voeux ECT 2026
24/12/2025

Our best wishes for 2026

  Best wishes 2026 Together, let’s continue to sustainably transform our communities. Thanks to your trust, ECT develops and delivers meaningful projects for local governments and the people they serve.

Read more
Louis - Paysagiste
18/12/2025

Landscape designer : when excavated earth becomes a land project

In May 2025, Louis Canesse joined the ECT landscaping team as a landscape designer. Today, he talks about the landscape designer’s role in the company’s non-built projects. FFrom project planning

Read more
ECT Icone ouverture de site
11/12/2025

ECT Hauts de France opens a new site in Harnes (62)

An accessible site for inert soil from the local construction industry Since December 8, the site in Harnes has been receiving inert soil from local construction sites. Located just 5

Read more

Pour recevoir
les dernières actualités d'ECT