New ECT site: backfilling of the Sibelco quarry at Crépy-en-Valois (60)

In partnership with Sibelco, ECT opens a new site in Oise (60)

The Sibelco quarry in Crépy-en-Valois opens its doors to receive inert soil from construction sites. The purpose of the site is to secure and develop the open-cast quarry. Following major development work carried out by ECT, the site has been ready to receive the first inputs since early November.

Facilities designed to welcome our construction customers 

  • Safe access to the site : creation of a left turn onto the main road and a dedicated access lane to facilitate and maintain traffic flow.
  • Soil traceability : at the receiving station, with the installation of load control cameras, a radioactivity detection portal and weighbridges. The site handles K3, K3+ and sorted rubble.
  • Flexible opening hours : the site opens from 7:00 a.m. to 4:15 p.m., last truck in.
  • Soil types accepted : K3 and K3+.

To access the Crépy-en-Valois site, you need to be validated by ECT’s reservations department.

Latest news

Voeux ECT 2026
24/12/2025

Our best wishes for 2026

  Best wishes 2026 Together, let’s continue to sustainably transform our communities. Thanks to your trust, ECT develops and delivers meaningful projects for local governments and the people they serve.

Read more
Louis - Paysagiste
18/12/2025

Landscape designer : when excavated earth becomes a land project

In May 2025, Louis Canesse joined the ECT landscaping team as a landscape designer. Today, he talks about the landscape designer’s role in the company’s non-built projects. FFrom project planning

Read more
ECT Icone ouverture de site
11/12/2025

ECT Hauts de France opens a new site in Harnes (62)

An accessible site for inert soil from the local construction industry Since December 8, the site in Harnes has been receiving inert soil from local construction sites. Located just 5

Read more

Pour recevoir
les dernières actualités d'ECT